Feed Machinery Feed Machinery
Wood sawdust pellet machinery Wood sawdust pellet machinery
/
/
Permit conditions for feed production enterprises (draft)

Permit conditions for feed production enterprises (draft)

  • Categories:行业动态
  • Author:
  • Origin:
  • Time of issue:2012-05-20
  • Views:1

(Summary description)o strengthen the supervision and management of feed production enterprises to ensure the quality and safety of feed products, according to "feed and feed additives management regulations"

Permit conditions for feed production enterprises (draft)

(Summary description)o strengthen the supervision and management of feed production enterprises to ensure the quality and safety of feed products, according to "feed and feed additives management regulations"

  • Categories:行业动态
  • Author:
  • Origin:
  • Time of issue:2012-05-20
  • Views:1
Information
To strengthen the supervision and management of feed production enterprises to ensure the quality and safety of feed products, according to "feed and feed additives management regulations" to develop the conditions. The conditions apply to the production of additives pre-mixed feed, concentrated feed, with feed and concentrate supplement business, except for a single feed production enterprises.
 
One, institutions and personnel
 
1. Enterprises set up technology, production, quality, sales, procurement and other management agencies, with full-time staff, the department heads and their job responsibilities clear.
 
2. The person in charge of the enterprise (chairman and general manager) is familiar with the laws and regulations of the feed industry and passes the examination organized by the feed management department.
 
3. Technical person in charge and business signed a formal and effective labor contract, with animal science, animal medicine, aquaculture professional college and above. Familiar with the feed industry laws and regulations and animal nutrition, product formulation design and other related professional knowledge, and through the feed management department of the examination.
 
4. Production person in charge and business signed a formal and effective labor contract, with animal science, animal medicine, aquaculture, light industry and textile, food, machinery, chemical and pharmaceutical and other related professional college and above. Familiar with the feed industry laws and regulations and feed processing technology and equipment, production process control, production management and other related professional knowledge, and through the feed management department of the examination.
 
5. Quality person in charge and business signed a formal and effective labor contract, with animal science, animal medicine, aquaculture, food science and engineering, chemical, biological sciences and other related professional undergraduate and above. Familiar with the feed industry laws and regulations and raw materials and product quality control, raw materials and product testing, product quality management and other related professional knowledge, and through the feed management department of the examination.
 
6. Raw material procurement and product sales person in charge and business signed a formal and effective labor contract. Familiar with the laws and regulations of the feed industry and pass the examination organized by the feed management department.
 
7. Feed inspection laboratory and the enterprise signed a formal and effective labor contract, the Ministry of Agriculture issued the "feed inspection laboratory" "People's Republic of vocational qualification certificate." Enterprises have at least two full-time feed inspection laboratory technician, production additives pre-mixed feed production enterprises at least one with senior workers and above vocational qualifications. Familiar with the feed industry laws and regulations, and through the feed management department organized examination and field operation skills assessment.
 
8. Feeder central control room operator, feed processing equipment maintenance workers and enterprises signed a formal and effective labor contract, issued by the Ministry of Agriculture issued a "feed mill central control room operator", "feed processing equipment maintenance workers" "People's Republic of China Vocational qualification certificate ", through the field operation skills assessment.
 
Second, the plant and layout
 
1. With the enterprise where the township level above the government departments agreed to set up the enterprise certification materials.
 
2. There is no pollution source around the plant that affects the quality and safety of feed products.
 
3. Have a certificate of ownership of the land in the factory or a lease agreement signed between the enterprise and the lessor (for a period not less than 5 years) and the land ownership certificate of the lessor.
 
4. Plant production area and life, office and other regional separation, the overall layout is reasonable, flow, logistics and smooth. Plant roads and workplaces using concrete or asphalt hardened, the other areas of the plant without exposed ground.
 
5. Production area has a relatively independent production workshop, raw materials, ingredients and finished products library.
 
6. Additive premix feed production workshop is set up separately. At the same time the production of solid and liquid additives pre-mixed feed, workshop isolation.
 
7. The buildings in the production area have good ventilation and lighting facilities. Ventilation using natural or artificial ventilation, natural lighting with rain function, artificial lighting with explosion-proof function.
 
8. The buildings within the plant meet the requirements of the Fire Code for Building Design and are equipped with the necessary fire facilities or equipment.
 
9. The factory has a perfect drainage system, the plant area of ​​rain, sewage using underground drainage pipe network system. There is an anti-clogging device at the entrance of the drainage system.
 
10. Equipment and facilities with safety risk, such as electricity, high temperature, high pressure, transmission, lifting, pit, observation hole, ladder, operation and maintenance platform, with warning signs and protective equipment, equipped with safety shoes and hats. High temperature equipment and facilities have a thermal insulation layer and "careful burn" warning signs or signs; pressure vessel on the safety valve protection device; all equipment (equipment) Of the transmission device has a complete protective cover; to enhance the basket around no less than 0.8m fence; feeding pit entrance with a complete fence; greater than 400mm × 400mm (or diameter greater than 400mm) observation hole equipped with protective fence; The workplace and the sloping ladder are not less than 1m of the fence; above 3m of the vertical ladder with a circular arc; all the equipment maintenance platform, operating platform and inclined ladder with no less than 1m fence; Shaped fence.
 
Third, technology and equipment
 
1. Additive premix feed (solid)
 
1.1 production line design capacity of not less than 2.5 tons / hour (annual single class 5000 tons), the main mixer effective volume of not less than 0.5m3, can explain the parameters of the product brochures and other supporting materials. There are complete sets of units including the carrier (diluent) crushing, batching, mixing, finished product packaging and other processes.
 
1.2 production line ingredients using computer automatic batching system. System dynamic accuracy of not more than 3 ‰, static accuracy of not more than 1 ‰, with the authority of the inspection issued by the organization or the technical parameters provided by the manufacturer to prove.
 
1.3 Mixer (including mixer buffer) made of two or more stainless steel materials (using at least 304 stainless steel, stainless steel material supplied with the material) or better performance. Mixer uniformity of the mixing coefficient of not more than 5%, with the qualifications of the institutions issued by the uniformity of the uniformity of the report or have to explain the parameters of the product specifications and other supporting materials.
 
1.4 production line dust collection using concentrated dust and a single point of dust combined with the way, the use of pulse dust collector or better performance of dust removal equipment. Feeding mouth and packing port with single point of dust. In the production conditions, the workshop operating area dust concentration of not more than 10mg / m3; emissions of dust concentration of not more than 150mg / m3.
 
1.5 small materials and the carrier (thinner) weighing using electronic scales, small materials put a separate configuration review electronic scales, two electronic said they have an effective measurement test certificate.
 
1.6 shredders, air compressors were used sound insulation measures. In the production conditions, the production site noise is not greater than 85dB.
 
1.7 The purchase invoice for all production equipment or the evidence that has been included in the enterprise's fixed assets.
 
2. Additive premix feed (liquid)
 
2.1 production process, including raw materials, pre-treatment, weighing, liquid, filtration, filling and other key processes, the entire production process closed.
 
2.2 All equipment, piping and fittings are made of stainless steel (at least 304 stainless steel, stainless steel material included).
 
2.3 If the production process involves homogeneous processes, high pressure homogenizer working pressure of not less than 50MPa, there can be a description of its product specifications and other proof materials, and has a high pressure alarm device. High pressure alarm device has a valid measurement certificate.
 
2.4 with liquid tank with sandwich design, with heating and thermal insulation function and temperature display device, the temperature display device has a valid measurement certificate.
 
2.5 has a separate filling function and filling metering equipment. Filling and weighing instruments have an effective measurement certificate.
 
2.6 The purchase invoice for the above equipment or the evidence that has been included in the enterprise's fixed assets.
 
3. Concentrated feed, with feed, concentrate supplement
 
3.1 production line design capacity of not less than 10 tons / hour (annual single production 20,000 tons), the effective volume of the mixer is not less than 2m3, can explain the effective volume of product brochures and other supporting materials. Professional processing of young livestock and poultry feed, aquatic nursery material, special feed, pet feed enterprises except.
 
3.2 ruminant concentrate supplement production line independent set, its production equipment, facilities are not shared with the production of other feed products.
 
3.3 production line ingredients using computer automatic batching system. System dynamic accuracy of not more than 3 ‰, static accuracy of not more than 1 ‰, with the authority of the inspection issued by the organization or the technical parameters provided by the manufacturer to prove.
 
3.4 Mixing machine uniformity of the variation coefficient of variation is not greater than 7%, with the qualifications of the institutions issued by the uniformity of the uniformity of the test report or product brochures and other supporting materials.
 
3.5 feed mill with the relevant state departments issued by the "industrial product production license" (copy).
 
3.6 shredders, air compressors, high pressure fans were used noise protection measures. In the production conditions, the production site noise is not greater than 85dB.
 
3.7 production line dust collection using concentrated dust and a single point of dust combined with the way, the use of pulse dust collector or better performance of dust removal equipment. Feeding mouth and packing port with single point of dust. In the production conditions, the workshop operating area dust concentration of not more than 10mg / m3; emissions of dust concentration of not more than 150mg / m3.
 
3.8 production line with liquid raw material to add the process, the use of automatic liquid additives.
 
3.9 additive pre-mixed feed preparation Weighing using electronic scales, small material delivery separate configuration review electronic scales, two electronic scales have an effective measurement test certificate.
 
3.10 Production of self-contained additives Pre-mixed feed at least one mixing device, the other requirements with the 1.3.
 
3.11 The purchase invoice (original) of all production equipment or the certified material that has been included in the enterprise's fixed assets.
 
Fourth, storage conditions
 
1. With the silo of the production enterprises, legislation silos to have a warehouse function, and equipped with ventilation systems and temperature monitoring devices.
 
There are raw materials, finished products, packaging materials, spare parts and other storage facilities, according to different materials, different types of appropriate isolation, with mildew, moisture, pest control, anti - bird, rodent control and other functions.
 
3. Storage of vitamins, microbes and enzyme preparation of the storage between the good performance, and equipped with air conditioning.
 
4. Drug feed additive has a separate storage room (area).
 
5. Sodium selenite and other feed additives managed by hazardous chemicals have independent storage rooms.
 
Fifth, quality inspection
 
Inspection laboratory
 
1.1 There are separate inspection laboratories located in the plant area and separate from the production workshop and the storage area.
 
1.2 Laboratory laboratory layout and facilities
 
1.2.1 pre-mixed vitamin feed (solid) production enterprises
 
1.2.1.1 The total laboratory area used is not less than 50m2.
 
1.2.1.2 Inspection Laboratory Functional partition includes analysis of the balance room, organic pretreatment room, inorganic pretreatment room, liquid chromatography room and sample observation room.
 
1) Analysis of the balance room: a day platform, set the buffer room. You can place analytical balances.
 
2) organic pretreatment room: a fume hood (reference conditions: 5mm safety glass window, with water basin, faucet, the door opening height of 0-600mm, table wind speed of 0.3-0.8m / s, displacement 1500-5000m³ / h, the system noise is not higher than 60 decibels, the same below), the experimental bench (reference conditions: wood or steel structure, solid core physical and chemical plate, acid and alkali corrosion resistance, high temperature 180 ℃, , Faucets, eyewash, the same below), containers counters, reagent cabinets, cylinders or cylinders fixed devices and dark, air conditioning and other facilities. Can be placed rotary evaporator, nitrogen bottle, ultra-pure water, water bath.
 
3) inorganic pretreatment room: a fume hood, instrument table, power supply, container cabinet. Can be placed constant temperature oven, high temperature furnace, sample crusher, standard sieve.
 
4) liquid chromatography room: there are equipment and dark, ventilation and other facilities. You can place a high performance liquid chromatograph.
 
5) Observation room: a sample cabinet, storage environment and product or raw material storage environment requirements consistent. Sample with vitamin additives and other heat-sensitive substances, equipped with air conditioning or low temperature refrigerator.
 
1.2.2 vitamin pre-mixed feed (liquid) production enterprises
 
1.2.2.1 inspection laboratory use a total area of ​​not less than 40m2.
 
1.2.2.2 Inspection laboratory functional partition includes analytical balance room, organic pretreatment room, liquid chromatography room and sample observation room.
 
1) Analysis of the balance room: a day platform, set the buffer room. Can be placed analytical balance, acidity meter.
 
2) organic pretreatment room: a fume hood, test bench, container cabinet, reagent cabinet, cylinder cabinet or cylinder fixed device and dark, air conditioning and other facilities. Can be placed rotary evaporator, nitrogen bottle, ultra-pure water, water bath.
 
3) liquid chromatography room: there are equipment and dark, ventilation and other facilities. You can place a high performance liquid chromatograph.
 
4) Observation room: a sample cabinet, storage environment and product or raw material storage environment requirements consistent. Samples such as vitamin additives and other heat-sensitive substances, if necessary, equipped with air conditioning or low temperature refrigerator.
 
1.2.3 trace element pre-mixed feed production enterprises
 
1.2.3.1 inspection laboratory use a total area of ​​not less than 40m2.
 
1.2.3.2 Inspection laboratory functional partition includes analytical balance room, inorganic pretreatment room, atomic absorption chamber and sample observation room.
 
1) Analysis of the balance room: a day platform, set the buffer room. You can place analytical balances.
 
2) inorganic pretreatment room: a fume hood, instrument table, power supply, container cabinet, reagent cabinet. You can place constant temperature drying oven, high temperature furnace, sample shredder, standard sieve, ultra water purifier.
 
3) Atomic Absorption Room: There are instrument, exhaust hood, upper and lower water system, cylinder or cylinder fixed device. Can be placed atomic absorption spectrophotometer, acetylene cylinder.
 
4) Observation room: a sample cabinet, storage environment and product or raw material storage environment requirements consistent.
 
1.2.4 compound premixed feed production enterprises
 
1.2.4.1 inspection laboratory use a total area of ​​not less than 60m2.
 
1.2.4.2 The function of the laboratory includes the analysis of the balance room, the organic pretreatment room, the inorganic pretreatment room, the liquid chromatography chamber, the atomic absorption chamber and the observation room.
 
1) Analysis of the balance room: a day platform, set the buffer room. You can place analytical balances;
 
2) organic pretreatment room: a fume hood, test bench, container cabinet, reagent cabinet, cylinder cabinet or cylinder fixed device and dark, air conditioning and other facilities. Can be placed rotary evaporator, nitrogen bottle, ultra-pure water, water bath.
 
3) inorganic pretreatment room: a fume hood, instrument table, power supply, container cabinet. Can be placed constant temperature oven, high temperature furnace, sample crusher, standard sieve.
 
4) liquid chromatography room: there are equipment and dark, ventilation and other facilities. You can place a high performance liquid chromatograph.
 
5) Atomic Absorption Room: There are instrument, exhaust hood, upper and lower water system, cylinder or cylinder fixed device. Can be placed atomic absorption spectrophotometer, acetylene cylinder.
 
6) Observation room: a sample cabinet, storage environment and product or raw material storage environment requirements consistent. Samples such as vitamin additives and other heat-sensitive substances, if necessary, equipped with air conditioning or low temperature refrigerator.
 
1.2.5 concentrated feed, with feed, concentrate supplement production enterprises
 
1.2.5.1 inspection laboratory use a total area of ​​not less than 50m2.
 
1.2.5.2 Laboratory laboratory functional division, including analysis of the balance room, physical and chemical analysis room, the general instrument room and the observation room.
 
1) Analysis of the balance room:

Scan the QR code to read on your phone

Relevant information

Copyright ©2021  Liyang Deconre Machinery Co., Ltd.   苏ICP备17070946号-1   www.300.cn Changzhou   IPv6